==Brew Hut Rebuilding Committee Minutes==
[[Brew Hut Minutes October 21 2004]]
[[Brew Hut Minutes February 9, 2005]]
==New hut construction==
==New hut construction==


[[Brew Hut rebuild/Tools list | Tools list]]
This section documents the effort to rebuild the [[Brew Hut]].


==Salvageable Materials== from existing Hut
===Upcoming Events===


* 8 2x10 beams in good condition - 14 1/2 feet long
===Project Tasks===
* ladder is good - 26 inches wide by 99.5 inches tall made of 2x6 tongue and groove
* 2x6 tongue + groove boards - perhaps 50% of siding boards in existing hut are salvageable.  Tongue + groove boards on upstairs floor are poor.  These boards have already been salvaged once, so they are in short lengths and will be full of nail holes.  Tongues + grooves may become damaged during removal.
* All plywood (exterior and floor) is heavily damaged.
* Hut furniture is crude, with the exception of one nice cooking bench.
* 3 of 8 laminated beam segments are cracked.  Each beam is approx 2 1/4 inches * 6 inches.
* miscellaneous 2x8 and 2x6 boards in good shape, but already cut to short lengths.


==Helicopter Info==
We still need help to do the following:


'''Helifor Industries''' will be doing some helilogging for Terminal Forest Products in the Spring, and again in the fall.  They can probably move all the materials in 2 loads, and each trip is estimated to be about 15 minutes.  The going rate for this helicopter is about $5000/hr, so that makes $2500 which is really reasonable.  Factoring in a 50% margin (since the trip time is a crude guesstimate) puts the cost at $3750.  They can provide us with slings at no charge.
* [[Brew_Hut_Rebuild/Finish the hut|Finish the hut]]


_____________________________________________
===Completed Project Tasks===


'''From Balckhom Helicopter (Nov 2004)'''
* [[Brew Hut Cleanup|Workhike to build outhouse and clean up garbage]] July 22-23, 2006
* Build Woodshed / Foundations for stairs / fly out garbage September 2006.
* Build Outhouse July 2006
* [[Brew_Hut_Rebuild/Final_Workhike|Final Workhike (for 2005)]] ''workhike October 29-30 to finish the interior and build the deck and stairs''
* [[Brew_Hut_Rebuild/Remove the old hut|Remove the old hut]] ''We did this on September 24-25 weekend''
* [[Brew Hut Rebuild/Planning-Scheduling| Planning-Scheduling]] - JP
* [[Brew Hut Rebuild/Prefab Construction| Prefab Construction]] - Roland
* [[Brew Hut Rebuild/Heater| Heater]] - Roland/Jordan
* [[Brew Hut rebuild/Foundation | Foundation]] - Rueben
* [[Brew Hut Rebuild/Foundation Layout | Foundation Layout]] - Rueben
* [[Brew Hut Rebuild/Sheet Metal|Sheet Metal Buying]] - JP (Temporary)
* [[Brew Hut Rebuild/Out House| Out House Prefab]] - Bill
* [[Brew Hut Rebuild/Transport|Transport]] - JP
* [[Brew Hut Rebuild/Helicopter|Helicopter]] - JP
* [[Brew_Hut_Rebuild/Build the outhouse|Build the outhouse]]


Type of helicopters the max weight load that each of them are able to carry & costs:
===Other stuff===
ASTAR B2 $1770.00 per hour max weight 1800
ASTAR BA $1570.00 per hour max weight 1500
ASTAR B $1470.00 per hour max weight 1200
Jetranger $1065.00 per hour max weight 600


Time, by helicopter, from your heliport to Brew Mountain:
* [[Brew Hut rebuild/Tools list | Tools list]]
.2 from heliport to Brew Mountain one-way, .4 return
* [[Brew Hut Rebuild/Salvageable Materials| Salvageable Materials]]
* [[Brew Hut Rebuild/Snowpack data| Snowpack data]]
* [[Proposed Brew Hut Sign]]


Only the flying time that is chargeable.
===Progress Reports===
     
* [[Brew Hut Minutes October 21 2004]]
* [[Brew Hut Minutes February 9, 2005]]
* [[Brew Hut Minutes March 1, 2005]]
* [[Brew Hut Rebuild/March 7|March 7]] - Lumber delivered to Roland's
* [[Brew Hut Rebuild/March 13|March 13]] - finished cutting joists; cut some studs for walls
* [[Brew Hut Rebuild/March 20|March 20]]
* [[Brew Hut Rebuild/March 30|March 30]] - finished cutting floor insulation; painting floor
* [[Brew Hut Rebuild/April 4|April 4]]
* [[Brew Hut Rebuild/April 11|April 11]]
* [[Brew Hut Rebuild/April 25|April 25]] - heater delivered, windows started.
* [[Brew Hut Rebuild/May 02|May 02]]
* [[Brew Hut Rebuild/May 21|May 21]] - helicoptered material
* [[Brew Hut Rebuild/June 12|June 12]]
* [[Brew Hut Rebuild/June 26|June 26]] - foundations finished
* [[Brew Hut Rebuild/July 9 to 17|July 9 to 17]] - the great brew build
* [[Brew Hut Rebuild/July 30|July 30]] - the great brew build - part 2
* [[Brew Hut Rebuild/September 24|September 24]] - the deconstruction of the old brew hut (brew 2)
* [[Brew_Hut_Rebuild/Final_Workhike|October 29]] - final 2005 workhike


Other place,closer to brew mountain, where we'll be able to load our stuff (closer than your heliport):
==New Brew Trail==
  Possibly at Brew Creek lodge with there promission
_____________________________________________________


==Snowpack data==
A new trail is part of the plan for the new hut.  See the wiki page for [[Brew Hut Trail Upgrade]]
 
The idea here is to establish snow accumulation patterns in the area.  Any data, even annecdotal, is welcome.
 
* April 1st, 2003 -- Snow up to the top of the roof at Brew hut.  Less than 1m of snow at microbrew.
* November 14, 2004 -- 1.0m in drift near Brew Hut, no snow at microbrew (scoured by steady 60km/h winds), 50-60cm at Brew Lake.  Light winds at brew hut (sheltered from trees) and in brew lake basin.
* February 6, 2005 -- 2.5m at Brew Hut, 60cm at microbrew (wind scoured to only 20cm immediately around microbrew), 2m at flat basin above brew lake, 1.6m at Brew Lake.  Steady NW winds at Brew hut and Mircobrew.  Light NW winds at upper basin and Brew Lake.
 
==New Brew Trail==


A new trail may be part of the plan for the new hut.  See the wiki page for [[New Brew Trail]]
[[Category:Construction]]

Latest revision as of 02:22, 25 October 2006

New hut construction

This section documents the effort to rebuild the Brew Hut.

Upcoming Events

Project Tasks

We still need help to do the following:

Completed Project Tasks

Other stuff

Progress Reports

New Brew Trail

A new trail is part of the plan for the new hut. See the wiki page for Brew Hut Trail Upgrade