We're hoping to get the load out of Roland's back yard around mid-May.  We'll probably truck the whole lot up to somewhere as close as possible, then helicopter it all in.  If conditions are suitable, foundations could be built over a few days to a week at this time.
Actual hut assembly could wait for warmer weather, say June-July, but we might not want to leave our building material lying around up there as it may get damaged by weather.  So we might build as soon as conditions permit.  This vagueness makes it hard to plan holidays for those who plan to be up there.
If we have the money, it would be nice to do a second helicopter flight much later, to:
-- Fly out any tools such as generators, picks, etc.
-- Fly in any things which we forgot for the first batch of flights.
-- Much later, fly out the metal from the old Hut, and any other debris.

Revision as of 18:44, 11 April 2005

More is gone be added in the future...

JP

We're hoping to get the load out of Roland's back yard around mid-May. We'll probably truck the whole lot up to somewhere as close as possible, then helicopter it all in. If conditions are suitable, foundations could be built over a few days to a week at this time.

Actual hut assembly could wait for warmer weather, say June-July, but we might not want to leave our building material lying around up there as it may get damaged by weather. So we might build as soon as conditions permit. This vagueness makes it hard to plan holidays for those who plan to be up there.

If we have the money, it would be nice to do a second helicopter flight much later, to:

-- Fly out any tools such as generators, picks, etc.

-- Fly in any things which we forgot for the first batch of flights.

-- Much later, fly out the metal from the old Hut, and any other debris.