Talk:Phelix Creek Trail Construction: Difference between revisions

From VOC Wiki
Jump to navigation Jump to search
imported>Swebster
merge with other page?
 
imported>ScottN
mNo edit summary
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
There is a link to the [[Phelix Creek west side trail]] page on the [[workhikes]] page.  Perhaps these pages could be merged and appropriately linked.  Maybe I'll do it sometime. [[User:Swebster|Scott Webster]] 23:16, 27 July 2007 (PDT)
There is a link to the [[Phelix Creek west side trail]] page on the [[workhikes]] page.  Perhaps these pages could be merged and appropriately linked.  Maybe I'll do it sometime. [[User:Swebster|Scott Webster]] 23:16, 27 July 2007 (PDT)
:I merged the other page into this one and deleted it.  [[User:ScottN|Scott Nelson]] 12:10, 15 June 2009 (PDT)
==Long Lake outlet bridge==
Sounds like a hand line is planned for this bridge.  If so, it better be very sturdy as there will be a 3m snowpack pushing it around in the winter and spring.  I belive that the rangers remove the railings in winter for all the high elevation bridges in Garibaldi Park (Taylor Creek, etc).  [[User:ScottN|Scott Nelson]] 10:48, 4 August 2009 (PDT)

Latest revision as of 22:59, 4 August 2009

There is a link to the Phelix Creek west side trail page on the workhikes page. Perhaps these pages could be merged and appropriately linked. Maybe I'll do it sometime. Scott Webster 23:16, 27 July 2007 (PDT)

I merged the other page into this one and deleted it. Scott Nelson 12:10, 15 June 2009 (PDT)

Long Lake outlet bridge

Sounds like a hand line is planned for this bridge. If so, it better be very sturdy as there will be a 3m snowpack pushing it around in the winter and spring. I belive that the rangers remove the railings in winter for all the high elevation bridges in Garibaldi Park (Taylor Creek, etc). Scott Nelson 10:48, 4 August 2009 (PDT)