Archive:Budget13-14: Difference between revisions

From VOC Wiki
Jump to navigation Jump to search
imported>Steffiyo
imported>Ryanmck
Line 12: Line 12:
* If the huts budget is all allocated, I'd like an additional $400 to build a new bridge up at Phelix. This time it will have a removable deck, so we'll need to take it down every fall, but at least it won't get destroyed by snow like the previous attempts.
* If the huts budget is all allocated, I'd like an additional $400 to build a new bridge up at Phelix. This time it will have a removable deck, so we'll need to take it down every fall, but at least it won't get destroyed by snow like the previous attempts.
* Why does the climbing wall have revenue? I thought there was not entrance fee? (Steph)
* Why does the climbing wall have revenue? I thought there was not entrance fee? (Steph)
==Huts (Ryan)==
Last year we budgeted $2500 for the huts.  Our expenses were as follows:
*Brew - no recorded expenses.
*Phelix - 2012 Reno (expenses itemized by Roland in the exec docs)
        - windows $710
        - other $200.69
        - total $910.69
*Burton - window $252.00
        - paint and other expenses (estimate) $150
        - Door $450
*Other  - Harrison project $320
        - Scott Nelson  $30
*Total: $2112.69  This leaves us $387.31 under budget but there will be additional expenses surrounding the door installation in April.

Revision as of 06:35, 19 March 2013

Questions

  • no need for miscellaneous revenue (Caitlin)
  • I dont understand the CAC stuff - does this include the ~$2000 we made and gave them (caitlin)
  • where does the journal price come from? (caitlin)
  • I would increase the Huts budget to something closer to $4000 - $5000 (caitlin)
  • FMCBC numbers should be same for both insurance and fees (Ben)
  • CAC fundraiser should not be a cost to the VOC (Ben)
  • Long hike should not be a money losing venture (Ben)
  • Why are we not sure what we paid for the website in 12-13? (Ben)
  • I thought there was talk that Equipment had not spent all of its budget.....looks like they are over budget (Ben)
  • If the huts budget is all allocated, I'd like an additional $400 to build a new bridge up at Phelix. This time it will have a removable deck, so we'll need to take it down every fall, but at least it won't get destroyed by snow like the previous attempts.
  • Why does the climbing wall have revenue? I thought there was not entrance fee? (Steph)

Huts (Ryan)

Last year we budgeted $2500 for the huts. Our expenses were as follows:

  • Brew - no recorded expenses.
  • Phelix - 2012 Reno (expenses itemized by Roland in the exec docs)
       - windows $710
       - other $200.69
       - total $910.69
  • Burton - window $252.00
       - paint and other expenses (estimate) $150
       - Door $450
  • Other - Harrison project $320
       - Scott Nelson  $30
  • Total: $2112.69 This leaves us $387.31 under budget but there will be additional expenses surrounding the door installation in April.