====Summary Notes====
== Summary Notes ==
*Run by: [[User:George|George]]
Run by: [[User:George|George]]
*Completed Hut Measurements including loft, main floor and door.
Completed Hut Measurements including loft, main floor and door.
*Rip-rap and wire mesh around hut working. Place new floor over old floor. May have to take out edge trimmings
Rip-rap and wire mesh around hut working. Place new floor over old floor. May have to take out edge trimmings
*Multiple logs across the 2nd part of the trail and low wood stock at the Hut warrants the need for a chainsaw
Multiple logs across the 2nd part of the trail and low wood stock at the Hut warrants the need for a chainsaw
*Still need to haul out old Coleman stove. Coleman Lamps working well and should be left at the Hut until an alternative can be put in place (solar).
Still need to haul out old Coleman stove. Coleman Lamps working well and should be left at the Hut until an alternative can be put in place (solar).
*Plywood floor must be flat edged for a perfect fit. 2' x 4' x 4' x 2' wide
Plywood floor must be flat edged for a perfect fit. 2' x 4' x 4' x 2' wide
====Raw Notes====
 
*need to do Floor Measurements
== Raw Notes ==
*Upstairs Railing (measurements) may have necessary material at the Hut. Need to do inventory.
need to do Floor Measurements
*New stove hauled up. Need to haul old stove down. Leave gas for lanterns.
Upstairs Railing (measurements) may have necessary material at the Hut. Need to do inventory.
*Running low on wood for the hut. Could use chainsaws on trail portion from end of logging road to barr creek bridge.
New stove hauled up. Need to haul old stove down. Leave gas for lanterns.
*Use chainsaws up at hut to cut more wood. -> is this necessary? Could an axe do the work? Do we have an axe at the hut?
Running low on wood for the hut. Could use chainsaws on trail portion from end of logging road to barr creek bridge.
*Nice guitar and case up to the hut with the helicopter? Need case to protect from moisture.
Use chainsaws up at hut to cut more wood. -> is this necessary? Could an axe do the work? Do we have an axe at the hut?
*Plywood in old outhouse.
Nice guitar and case up to the hut with the helicopter? Need case to protect from moisture.
*Have two bow-saws at hut.
Plywood in old outhouse.
*There will be standard door frames. Non-standard door frames will be expensive. Want 1/2" to 1/4" door frame for steel door.
Have two bow-saws at hut.
*Want door to extend right to wall. Need to put aluminum to fit to door.
There will be standard door frames. Non-standard door frames will be expensive. Want 1/2" to 1/4" door frame for steel door.
*2x3 wood
Want door to extend right to wall. Need to put aluminum to fit to door.
*aluminim paneling on outside of hut
2x3 wood
*Chicken wire and rip-rap around seems to be working against the marmots.
aluminim paneling on outside of hut
*Would be nice to have signage along logging road for directions to hut and to the springs
Chicken wire and rip-rap around seems to be working against the marmots.
*signage for the springs is more important because of the turn off on the logging road.
Would be nice to have signage along logging road for directions to hut and to the springs
*some sections of the trail could use brushing. Mostly the first 6km. 2nd part is in good condition with exception of the fallen logs.
signage for the springs is more important because of the turn off on the logging road.
*would be nice to have poker chips & a nice set of cards @ the hut. Maybe a rumoli matt
some sections of the trail could use brushing. Mostly the first 6km. 2nd part is in good condition with exception of the fallen logs.
*bridge right next to hut seems unnecessary for all seasons (may not spring? idk, need to see pictures)
would be nice to have poker chips & a nice set of cards @ the hut. Maybe a rumoli matt
*hay wire and duct tape for all huts
bridge right next to hut seems unnecessary for all seasons (may not spring? idk, need to see pictures)
*for harrison put floor ontop of old floor. 2' x 4' x 4' x 2' to overlap cracks
hay wire and duct tape for all huts
*will want to rip in vancouver
for harrison put floor ontop of old floor. 2' x 4' x 4' x 2' to overlap cracks
*make sure door is hollow. & talk to someone about fit.
will want to rip in vancouver
make sure door is hollow. & talk to someone about fit.

Latest revision as of 07:21, 3 January 2019

Summary Notes

  • Run by: George
  • Completed Hut Measurements including loft, main floor and door.
  • Rip-rap and wire mesh around hut working. Place new floor over old floor. May have to take out edge trimmings
  • Multiple logs across the 2nd part of the trail and low wood stock at the Hut warrants the need for a chainsaw
  • Still need to haul out old Coleman stove. Coleman Lamps working well and should be left at the Hut until an alternative can be put in place (solar).
  • Plywood floor must be flat edged for a perfect fit. 2' x 4' x 4' x 2' wide

Raw Notes

  • need to do Floor Measurements
  • Upstairs Railing (measurements) may have necessary material at the Hut. Need to do inventory.
  • New stove hauled up. Need to haul old stove down. Leave gas for lanterns.
  • Running low on wood for the hut. Could use chainsaws on trail portion from end of logging road to barr creek bridge.
  • Use chainsaws up at hut to cut more wood. -> is this necessary? Could an axe do the work? Do we have an axe at the hut?
  • Nice guitar and case up to the hut with the helicopter? Need case to protect from moisture.
  • Plywood in old outhouse.
  • Have two bow-saws at hut.
  • There will be standard door frames. Non-standard door frames will be expensive. Want 1/2" to 1/4" door frame for steel door.
  • Want door to extend right to wall. Need to put aluminum to fit to door.
  • 2x3 wood
  • aluminim paneling on outside of hut
  • Chicken wire and rip-rap around seems to be working against the marmots.
  • Would be nice to have signage along logging road for directions to hut and to the springs
  • signage for the springs is more important because of the turn off on the logging road.
  • some sections of the trail could use brushing. Mostly the first 6km. 2nd part is in good condition with exception of the fallen logs.
  • would be nice to have poker chips & a nice set of cards @ the hut. Maybe a rumoli matt
  • bridge right next to hut seems unnecessary for all seasons (may not spring? idk, need to see pictures)
  • hay wire and duct tape for all huts
  • for harrison put floor ontop of old floor. 2' x 4' x 4' x 2' to overlap cracks
  • will want to rip in vancouver
  • make sure door is hollow. & talk to someone about fit.