Archive:Brew Hut Rebuild/Prefab Construction: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
imported>Dehike m Dehike moved page Brew Hut Rebuild/Prefab Construction to Archive:Brew Hut Rebuild/Prefab Construction: Mass moving of pages, see VOCWiki:Wiki cleanup 2014-15 |
||
| (6 intermediate revisions by 2 users not shown) | |||
| Line 10: | Line 10: | ||
* Roof framer: Cut rafters and ridge board, etc. Gussets and/or collarties and/or hurricane ties. Additional wood for this? | * Roof framer: Cut rafters and ridge board, etc. Gussets and/or collarties and/or hurricane ties. Additional wood for this? | ||
* Furnature | * Furnature | ||
==Floors== | |||
*Floor platforms, joists are all cut to size. | |||
*T&G Plywood cut, but it is low quality and has lots of little holes where knots have come out of it. | |||
*Attic floor has now been painted with 3 coats of urethane paint. | |||
*Main floor will be painted with urethane plus non-slip additive. | |||
*Styrofoam insulation for underneath lower floor has been cut to size. | |||
==Walls and Windows== | |||
*Metal door has been bought and painted. | |||
*3 Windows by Roland: One window is ready to fly; two others nearly ready | |||
*4 windows by Scott and Ross Nelson: As of May 8th, all 4 frames are built and we are ready to order glass. 2 end wall windows will open on door hinges, and the 2 windows for above the cooking area will open outwards at the bottom (awning style). | |||
*Shear strength of end walls is a concern. | |||
*Wind load on the hut for high winds is unknown. | |||
*Shutters for windows on main floor - upstairs as well? | |||
==Roof== | |||
*Need to purchase hurricane ties, metal roofing material and flashings | |||
==Furniture== | |||
*Table | |||
*Bench | |||
*Sleeping bench | |||
*Cooking counter | |||
*ladder | |||
*wood stove | |||
Latest revision as of 22:03, 6 February 2015
Currently supervised by Roland (we are working in his back yard).
Construction is usually at Saturday from 10am - 4pm and Sunday from 12pm - 4pm.
General tasks to do:
- Build walls
- Build/ buy windows
- Painting
- Roof framer: Cut rafters and ridge board, etc. Gussets and/or collarties and/or hurricane ties. Additional wood for this?
- Furnature
Floors
- Floor platforms, joists are all cut to size.
- T&G Plywood cut, but it is low quality and has lots of little holes where knots have come out of it.
- Attic floor has now been painted with 3 coats of urethane paint.
- Main floor will be painted with urethane plus non-slip additive.
- Styrofoam insulation for underneath lower floor has been cut to size.
Walls and Windows
- Metal door has been bought and painted.
- 3 Windows by Roland: One window is ready to fly; two others nearly ready
- 4 windows by Scott and Ross Nelson: As of May 8th, all 4 frames are built and we are ready to order glass. 2 end wall windows will open on door hinges, and the 2 windows for above the cooking area will open outwards at the bottom (awning style).
- Shear strength of end walls is a concern.
- Wind load on the hut for high winds is unknown.
- Shutters for windows on main floor - upstairs as well?
Roof
- Need to purchase hurricane ties, metal roofing material and flashings
Furniture
- Table
- Bench
- Sleeping bench
- Cooking counter
- ladder
- wood stove