|
|
| (103 intermediate revisions by 13 users not shown) |
| Line 1: |
Line 1: |
| Current discussion on the [http://www.ubc-voc.com/phorum2/read.php?f=1&i=39613&t=39613 VOC message board]] about new outhouse and trail building.
| | #REDIRECT [[Harrison Hut Trail]] |
| | |
| ==Previous work==
| |
| | |
| ===June 20 - 21, 2008===
| |
| [[Harrison Hut Recon June 2008]]<br> | |
| Door to the hut was finally installed. Some of the loose metal roofing was fixed with screws. Trail was flagged with blue flagging tape.<br>
| |
| See also the [http://www.ubc-voc.com/phorum2/read.php?f=3&i=4442&t=4182 VOC message board]
| |
| | |
| ===Aug. 2 - 3, 2008===
| |
| Pete and Kristen went up to the hut and did some more flagging of the trail, and built some extra cairns on the traverse below pine bump.<br>
| |
| See TR on the [http://www.ubc-voc.com/phorum2/read.php?f=3&i=4922&t=4909 VOC message board]
| |
| | |
| ===Aug. 30 - Sept. 1, 2008===
| |
| [[Mountaineering_Camp_2008|Annual mountaineering camp]] was held at Harrison Hut. A money drop box was installed, as well as some more work on screwing down the loose metal roofing was done.<br>
| |
| See [http://www.ubc-voc.com/phorum2/read.php?f=3&i=5051&t=4994 VOC message board]
| |