==Questions==
==Questions==


*no need for micellaneous revenue (Caitlin)
*no need for miscellaneous revenue (Caitlin)
*I dont understand the CAC stuff - does this include the ~$2000 we made and gave them (caitlin)
*I dont understand the CAC stuff - does this include the ~$2000 we made and gave them (caitlin)
*where does the journal price come from? (caitlin)
*where does the journal price come from? (caitlin)
* I would increase the Huts budget to something closer to $4000 - $5000 (caitlin)
* I would increase the Huts budget to something closer to $4000 - $5000 (caitlin)
* I dont think the pool numbers are correct... we have not lost $200... (caitlin)
* FMCBC numbers should be same for both insurance and fees (Ben)
* CAC fundraiser should not be a cost to the VOC (Ben)
* Long hike should not be a money losing venture (Ben)
* Why are we not sure what we paid for the website in 12-13? (Ben)
* I thought there was talk that Equipment had not spent all of its budget.....looks like they are over budget (Ben)
* If the huts budget is all allocated, I'd like an additional $400 to build a new bridge up at Phelix. This time it will have a removable deck, so we'll need to take it down every fall, but at least it won't get destroyed by snow like the previous attempts.
* Why does the climbing wall have revenue? I thought there was not entrance fee? (Steph) - revenue is from the comp, most goes to the prizes
==Huts (Ryan)==
Last year we budgeted $2500 for the huts.  Our expenses were as follows:
*Brew - no recorded expenses.
*Phelix - 2012 Reno (expenses itemized by Roland in the exec docs)
        - windows $710
        - other $200.69
*Burton
        - window $252.00
        - paint and other expenses (estimate) $150
        - Door $450
*Other 
        - Harrison project $320
        - Scott Nelson  $30
*Total: $2112.69  This leaves us $387.31 under budget but there will be additional expenses surrounding the door installation in April.
To date the Revenue from our huts is as follows:
        - Brew $222.37
        - Phelix $1470
        - Burton $140
        - Total $1832.37
For the upcoming year I suggest the following:
*Brew
        - $1500 for windows and renovation
*Phelix
        - $400 Bridge
        - $500 Paint
        - $200 Outhouse Testing
        - $??? Mold problems
This is a total of $2600.
For future reference, Christian Veenstra has provided me with the following info:
The cost of having 3 cords of dry rounds delivered in a single truckload is roughly $1000.  The cost of helicoptering garbage out of Brew 6 years ago was roughly $1500.

Latest revision as of 03:17, 28 January 2015

Questions

  • no need for miscellaneous revenue (Caitlin)
  • I dont understand the CAC stuff - does this include the ~$2000 we made and gave them (caitlin)
  • where does the journal price come from? (caitlin)
  • I would increase the Huts budget to something closer to $4000 - $5000 (caitlin)
  • I dont think the pool numbers are correct... we have not lost $200... (caitlin)
  • FMCBC numbers should be same for both insurance and fees (Ben)
  • CAC fundraiser should not be a cost to the VOC (Ben)
  • Long hike should not be a money losing venture (Ben)
  • Why are we not sure what we paid for the website in 12-13? (Ben)
  • I thought there was talk that Equipment had not spent all of its budget.....looks like they are over budget (Ben)
  • If the huts budget is all allocated, I'd like an additional $400 to build a new bridge up at Phelix. This time it will have a removable deck, so we'll need to take it down every fall, but at least it won't get destroyed by snow like the previous attempts.
  • Why does the climbing wall have revenue? I thought there was not entrance fee? (Steph) - revenue is from the comp, most goes to the prizes

Huts (Ryan)

Last year we budgeted $2500 for the huts. Our expenses were as follows:

  • Brew - no recorded expenses.
  • Phelix - 2012 Reno (expenses itemized by Roland in the exec docs)
       - windows $710
       - other $200.69
  • Burton
       - window $252.00
       - paint and other expenses (estimate) $150
       - Door $450
  • Other
       - Harrison project $320
       - Scott Nelson  $30
  • Total: $2112.69 This leaves us $387.31 under budget but there will be additional expenses surrounding the door installation in April.

To date the Revenue from our huts is as follows:

        - Brew $222.37
        - Phelix $1470
        - Burton $140
        - Total $1832.37

For the upcoming year I suggest the following:

  • Brew
        - $1500 for windows and renovation
  • Phelix
        - $400 Bridge
        - $500 Paint
        - $200 Outhouse Testing
        - $??? Mold problems

This is a total of $2600.

For future reference, Christian Veenstra has provided me with the following info: The cost of having 3 cords of dry rounds delivered in a single truckload is roughly $1000. The cost of helicoptering garbage out of Brew 6 years ago was roughly $1500.