Archive:Brew Hut Rebuild/April 25: Difference between revisions
Jump to navigation
Jump to search
imported>Roland No edit summary |
imported>ScottN mNo edit summary |
||
| Line 1: | Line 1: | ||
Last week we bought the wood-burning heater, paid for it, it was transported to Vancouver, and a hole was cut for the stovepipe. And we got donated some more sheet metal flashng. | Last week we bought the wood-burning heater, paid for it, it was transported to Vancouver, and a hole was cut for the stovepipe. And we got donated some more sheet metal flashng. | ||
Sunday we sorted materials, took apart the main floor platform, and painted window trim. Scott and his Dad have started on building the | Sunday we sorted materials, took apart the main floor platform, and painted window trim. Scott and his Dad have started on building the remaining four windows. | ||
Revision as of 16:51, 25 April 2005
Last week we bought the wood-burning heater, paid for it, it was transported to Vancouver, and a hole was cut for the stovepipe. And we got donated some more sheet metal flashng.
Sunday we sorted materials, took apart the main floor platform, and painted window trim. Scott and his Dad have started on building the remaining four windows.