Archive:Brew Hut Rebuild/Prefab Construction: Difference between revisions

From VOC Wiki
Jump to navigation Jump to search
No edit summary
 
imported>ScottN
No edit summary
Line 10: Line 10:
* Roof framer:  Cut rafters and ridge board, etc.  Gussets and/or collarties and/or hurricane ties.  Additional wood for this?
* Roof framer:  Cut rafters and ridge board, etc.  Gussets and/or collarties and/or hurricane ties.  Additional wood for this?
* Furnature
* Furnature
==Floors==
*Floor platforms complete
*T&G Plywood cut, but it is low quality and has lots of little holes where knots have come out of it.
*Plan to use deck paint to smooth out floor surface for both upstairs and downstairs floors
*Styrofoam insulation for underneat lower floor is nearly all cut to size
==Walls and Windows==
*Need to decide on exact window placement before starting on framing walls
*Metal door has been bought and painted
*Shear strength of end walls is a concern
*Wind load on the hut for high winds is unknown
*Shutters for windows on main floor - upstairs as well?
==Roof==
*Need to purchase hurricane ties, metal roofing material and flashings
==Furniture==
*Table
*Bench
*Sleeping bench
*Cooking counter
*ladder
*wood stove

Revision as of 16:55, 22 March 2005

Currently supervised by Roland (we are working in his back yard).

Construction is usually at Saturday from 10am - 4pm and Sunday from 12pm - 4pm.

General tasks to do:

  • Build walls
  • Build/ buy windows
  • Painting
  • Roof framer: Cut rafters and ridge board, etc. Gussets and/or collarties and/or hurricane ties. Additional wood for this?
  • Furnature

Floors

  • Floor platforms complete
  • T&G Plywood cut, but it is low quality and has lots of little holes where knots have come out of it.
  • Plan to use deck paint to smooth out floor surface for both upstairs and downstairs floors
  • Styrofoam insulation for underneat lower floor is nearly all cut to size

Walls and Windows

  • Need to decide on exact window placement before starting on framing walls
  • Metal door has been bought and painted
  • Shear strength of end walls is a concern
  • Wind load on the hut for high winds is unknown
  • Shutters for windows on main floor - upstairs as well?

Roof

  • Need to purchase hurricane ties, metal roofing material and flashings

Furniture

  • Table
  • Bench
  • Sleeping bench
  • Cooking counter
  • ladder
  • wood stove