===2016-10-01 Lizzie===
===2016-10-01 Lizzie===
====Summary Notes====
*Completed Hut Measurements including loft, main floor and door.
*Rip-rap and wire mesh around hut working. Place new floor over old floor. May have to take out edge trimmings
*Multiple logs across the 2nd part of the trail and low wood stock at the Hut warrants the need for a chainsaw
*Still need to haul out old Coleman stove. Coleman Lamps working well and should be left at the Hut until an alternative can be put in place (solar).
*Plywood floor must be flat edged for a perfect fit. 2' x 4' x 4' x 2' wide
====Raw Notes====
*need to do Floor Measurements
*Upstairs Railing (measurements) may have necessary material at the Hut. Need to do inventory.
*New stove hauled up. Need to haul old stove down. Leave gas for lanterns.
*Running low on wood for the hut. Could use chainsaws on trail portion from end of logging road to barr creek bridge.
*Use chainsaws up at hut to cut more wood. -> is this necessary? Could an axe do the work? Do we have an axe at the hut?
*Nice guitar and case up to the hut with the helicopter? Need case to protect from moisture.
*Plywood in old outhouse.
*Have two bow-saws at hut.
*There will be standard door frames. Non-standard door frames will be expensive. Want 1/2" to 1/4" door frame for steel door.
*Want door to extend right to wall. Need to put aluminum to fit to door.
*2x3 wood
*aluminim paneling on outside of hut
*Chicken wire and rip-rap around seems to be working against the marmots.
*Would be nice to have signage along logging road for directions to hut and to the springs
*signage for the springs is more important because of the turn off on the logging road.
*some sections of the trail could use brushing. Mostly the first 6km. 2nd part is in good condition with exception of the fallen logs.
*would be nice to have poker chips & a nice set of cards @ the hut. Maybe a rumoli matt
*bridge right next to hut seems unnecessary for all seasons (may not spring? idk, need to see pictures)
*hay wire and duct tape for all huts
*for harrison put floor ontop of old floor. 2' x 4' x 4' x 2' to overlap cracks
*will want to rip in vancouver
*make sure door is hollow. & talk to someone about fit.


==File Manager==
==File Manager==

Revision as of 03:12, 12 October 2016

George Hill is the current 2016-2017 Huts Coordinator for the VOC. To get in touch please leave a message on the discussion page or send an email to info@ubc-voc.com


Workhikes

2016-07-01 Phelix

2016-09-03 Harrison

2016-10-01 Lizzie

File Manager

Documents

Hut Issues

Trail Issues

GPX Tracks

Brew

Lizzie

Images

Lizzie Creek Cabin

Inventory October 1st 2016

Stock Photos Tool Inventory