Brew Hut rebuild/Foundation

From VOC Wiki
Revision as of 16:49, 22 March 2005 by 142.103.165.12 (talk)
Jump to navigation Jump to search

Claimed by Rueben Schulz

What I get to do

  • Prepare list of materials to buy, with costs, prepare a schedule for making foundations.
  • Bug the people I know for information about how to do this.
  • Look over the book JP has about building with stone.

Preliminary Plans

  • Reconnaissance once snow gone:
    • Survey site
    • Dig hole(s) to bedrock (need pick, shovel, bar)
    • Practice stacking rocks
    • Maybe practice sticking rocks together with mortar
  • Decide on specific foundation design
  • Get needed matierials on helicopter
  • Get unsuspecting slaves to do lots of manual work (dig 6 holes, transport and wash rocks, mix mortar)

Preliminary Design

  • 6 pier rock foundations held together with mortar (and chicken wire?)
  • Rebar connecting foundation to bedrock (assuming not too deep)
  • Foundations topped with level saddle.
  • Beams fit on saddles (6). Beams are 20'-0" long.
  • Beams are 4.5" wide. Outside faces of beams are 11'-10.5 inches apart.