Harrison Hut route

From VOC Wiki
Revision as of 22:56, 3 October 2008 by imported>Bramvs (Created new page to keep track of work that has been done, and remains to be done on hut and trail)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Current discussion on the VOC message board] about new outhouse and trail building.

Previous work

June 20 - 21, 2008

Harrison Hut Recon June 2008
Door to the hut was finally installed. Some of the loose metal roofing was fixed with screws. Trail was flagged with blue flagging tape.
See also the VOC message board

Aug. 2 - 3, 2008

Pete and Kristen went up to the hut and did some more flagging of the trail, and built some extra cairns on the traverse below pine bump.
See TR on the VOC message board

Aug. 30 - Sept. 1, 2008

Annual mountaineering camp was held at Harrison Hut. A money drop box was installed, as well as some more work on screwing down the loose metal roofing was done.
See VOC message board