Archive:Exec Report - Special Projects 2008 - 2009

From VOC Wiki
Revision as of 07:27, 21 April 2009 by imported>Jfergs (New page: ''Special Projects Coordinator: Jeff Ferguson'' == Overview == Minor repairs were completed this winter. Most large projects need to be done during the summer months. == Routine Mainte...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Special Projects Coordinator: Jeff Ferguson

Overview

Minor repairs were completed this winter. Most large projects need to be done during the summer months.

Routine Maintenance

Brew

- Replaced broken window latch - New hole for outhouse needed in near future?


Phelix

- A group made repairs to the roof in October. - Assessed mildew. Took measurements for exposed wood surface area in order to calculate how much paint is needed. Interior painting to be done in summer 2009. - Measurements taken and details recorded on the solar panel. Roland plans to do something with this. Batteries are dead beyond repair.

Harrison

- discussion about replacing/renovating the outhouse. Nothing confirmed. - Trail design and location in progress. Pete Hudson in charge.